Plant Maintenance & Quality Management 2

  • ... Gross req planning situation...
  • about result analysis (POC)
  • ATP Check for planned orders CO28
  • Automatic generation of Production Orders
  • Batch classification - Urgent
  • Budget check error when creating a PO based on several PR
  • Catalogs
  • Change characteristic value during order creation
  • change values
  • Check backflushed components?
  • Configurable Material
  • Configuration of configurable material
  • CS / PM Some basic questions again
  • Data Transfer
  • Defaulting Operation Work Center
  • Deleted materials not shown in change documents
  • Demand Pegging Related Question
  • Diff. Stock Types by diff. Order Types for the same Material
  • Different BOM's for Prodn Order and Purchase Order
  • DP90: Same material Debited & Credited
  • Early Inspection Lot Creation and GR's
  • equipment for external evaluation
  • Equipment number unique
  • finding user exits
  • Function Location
  • goods receipt error
  • GR processing time PP/MM
  • Group And Group Counter
  • How cost center during PM order release is determined
  • How does time restriction work?
  • How to activate task list hierarchy
  • How to Configure Engineering Change Management??
  • How to generate PR containing multi-line items in MRP run?
  • How to give target value for a Qualitative characteristic
  • How to transfer RR data for one inspection lot to another?
  • Insert task list without renumbering
  • Insp. Char. and Defects Recording!
  • Insp.lot 03 doesn't show in the CoA
  • Inspection lot not created
  • Inspection lot qty different that total quantity posted.
  • Inspection of primary and pooled samples
  • Inspection plan isn't found.
  • Inspection Points not working for 04 early inspection lots?
  • Inspection results
  • Laboratory Information System
  • LSMW for Inspection Plan
  • Maintaining spec's
  • Maintenance order once a week
  • material based control limits for MIC
  • Material not BACKFLUSHED
  • MCI7, no data showing
  • Mobile Infrastructure Questions
  • Moderating the QM forum
  • Moving q stock
  • Mvt Types and the difference between them
  • Need to release stock from QI. Cannot do via Inspection Lot
  • Notifications: limiting catalog selection
  • OPS6-maintenance witout customizing(responsible WBS-element)
  • Partial lots and class characterisitics
  • Pl. list MM-QM integration areas...
  • Planned Delivery time question
  • Planning Calendars for Scheduling
  • Planning plant and purchasing organization assignment
  • Planning Tools
  • Plant maintenance implementation questions & answers
  • PM & CS Project Considerations
  • Posting UD to Blocked Stock through Inspection Type 10
  • Problem with the planned order in MRP run
  • Production order qty confirmation
  • Production order qty for Variant configuration
  • PS help
  • QM interface with LIMS
  • QM-Dude (Lot to lot results transfer)
  • QM-Dude and craig.
  • Returns Processing in QM
  • SAP master data tables for workcenter and Routing
  • Setting up permit for automatic assignment to PM Order
  • Source Inspections
  • Source inspn-how to assign inspn lots to specific inspector?
  • Specification class characteristic vs. MIC
  • Strange problem in vendor evaluation
  • Suggestion for improvement
  • Take over values form QM result recording in PM notification
  • THE NEW PROGRESS ANALYSIS IN 46C
  • To cancel Usage Decision and reverse matl. movement doc
  • Transfer of batch results
  • Usage decision on semi finished and finished products
  • User exit for inspection lot short text checking
  • User exit in CJ20N transaction
  • User Exit IWO10020
  • user staus to signify that work has been completed
  • Variant configuration and Batch Management
  • what is the process to be followed in PP module.
  • Work orders - auto fill operation long text
  • Working with LSMW - routing(direct input)
  • Copyright ?2007 - 2008 www.jt77.com