Change the Material Type

Question: Dear Friends,

Can i change the material type of one material.? if yes, what are the conditions to check for the same??

regards
SSS

You can change the material type using T-code MMAM.

regards

Answer:
You need to check that there is no stock, no open movements, no open orders etc. in order to change a materials type.
_________________
Kind Regards

Rosie Brent

Please remember to search the forum and check the FAQ before posting questions, thank you.

Tuly Idiot most of the time, part-time Guru

Answer:
yeah, then it should be possible .....technically.

But think about number ranges. if your 2 material types uses different material number ranges, then you screw up all the logic you have hardly defined in the design phase.

Answer:
Hi,

Also think about the field selection status together with valuation class you have been using in both material types. The 'quantity-update' and 'value-update' setting in both material types plant-wise shall also be taken into due consideration.

Cheers,
HT
_________________
Moderator:
Copyright ?2007 - 2008 www.jt77.com