Question:
Hi,
There is a Technical problem for me, can any one help me.
I have two output types which are named as AB and CD, which are parallelly triggering.But my requirement is After completion of outputtype AB only the another CD should be processed.
Please let me know the solutions.
thanks in advance,
suvidha.
Answer:
Hello,
Can you tell me where and how they are triggered please?
Thx
Yoolb
_________________
PRO IT
Consulting for You and Me
Http://www.proit.be
Answer:
The easiest way would be to schedule RSNAST00 for the different output types
_________________
Ta'
Dr Shinks
Answer:
The easiest way would be to schedule RSNAST00 for the different output types
But first output type is using RSNAST00 and second is using RSNASTED as it is previously assigned to trigger immediately.So they processed parrallelly.
Regards,
suvidha.
Answer:
Don't let it trigger immediately then.
_________________
Ta'
Dr Shinks
Answer:
Don't let it trigger immediately then.
u mean i have to schedule these as two background jobs(multi steps),
which troggered for every 15 minutes.I got this idea Is there any other better solution than this?
Thnx,
suvidha.
Answer:
What output is being propsed and whyh do they need to be processed in this sequence.
_________________
Ta'
Dr Shinks
Answer:
What output is being propsed and whyh do they need to be processed in this sequence.
ok i will tell u.
The Return salesOrder numbers that are returned by output type AB are necessary for output type CD.That's why i required this functionality.
Thnx,
nanda.