data mining(ABC analysis)

Question: Dear Experts,

we have craeted ABC analysis in data mining work bench through create a model and train the model after that send the result to ods object.

the problem is that how to auto mate this process with process chain.

we have a process chain , after data loading to the cube, ABC analysis has to be start, then load to ods.

how to integate ABC analysis ( data mining work bench) with process chain.

thanks in advance.

BW Guest.

Answer:
you need to trigger the event.

Answer:
hello flying potato

can u give deatiled picture.


Regards,
BW Guest.
Copyright ?2007 - 2008 www.jt77.com