Question:
I have 4 snp ppms with lotsize ranges 0-100,101-200,201-400,401-800.
I have my product set to lot for lot on the product lotsize tab.
I get two order for the same day that are 500 each. The snp heuristic will not create an order.
If I increase the lotsize of the top ppm to 1000 it works. I looks like it is not repecting the lot for lot requriement before it tries to select a valid ppm.
any ideas?
Answer:
Please check for the setting in material master that clubs daily requirements.