Question: HI ALL,
I ran into a situation when I run SNP plan for three level products. SNP creats planned orders for first level components, Prs for externally procured materials at all three levels. But does not generates any planned orders for second level product which is manufactured in house.
I can clearly see dependent demand for SNP(second level product) with cat. EL and I used multi level, network and location huristcs.It works fine with PPDS in same senerio.Surprise is that I have tested in another box works fine with same setting and master data.
When I donot use SNP PPM ( used mannual created PPM and also PPDS converted PPM) it creats planned orders, PPM seesm to be fine as I ran consistnece check and it is ok.
Can some throw a light on this.
thanks
shyam

Answer:
it solved