Business Connector merge problem during heavy workload

Question: Hello all,

Maybe some of you recognize the following.

For a customer we have connected SAP Retail to Business Connector 4.6.
I built a flow service to make flat files out of DELVRY03-Idocs (outbound).
We use Idoc packets of 100 Idocs (transaction WE20).
Every Idoc package should make 1 output file.

During normal traffic, everything works perfectly. But during heavy workload (eg when processing allocation tables) a lot of DELVRY03's are created with the same timestamp and somehow the BC seems to mix up Idocs from packages with the same timestamp. The outputfiles are corrupted and look like a mix of several Idoc packages.

Is there anyone out there who has seen this before and knows where to look?

Thanks!

Regards
Journey

Answer:
Hi,

similar problems are solved with BC 4.7 SR3.

Regs

Answer:
Journey,
I am trying to do something very similar to your case. Could you please give me the steps in your flow service.

How do I post the IDOC from the SAP BC to an URL? I am able to send the IDOC (DELVR03 type) to a service in SAP BC. I have created a record referencing http://ifr.sap.com. I have also created the mapping step where I map the individual data fields to from the IDOC to a custom fields (customer format).

My problem is how do I proceed to create an XML file to post to an URL from here? Do I need to create another step after the mapping or is there a service that I need to invoke?

I sincerely appreciate any help.
Copyright ?2007 - 2008 www.jt77.com