Question:
Hi Everyone,
How can I set the SNP Product Horizon?
In my case the SNP product horizon is already in the past, ex 19.04.2005
then I create a forecast today 21.04.2005. I run the heuristics and it doesn't generates an SA line. I create an order and I'm trying to release the SA line, I can't release it.
I can't figure out wha'ts wrong.
In APO logic is it necessary to release an SA lines within the range of SNP product horizon?
Hoping for your help.
Thank you very much.
Best Regards,
Jet
Answer:
The SNP Production Horizon is the Period during which SNP will NOT create any production planned orders within, but will create any required production on the first day outside of this horizon. If you have a 0 in the production horizon field, then in the product view it will indeed display the SNP Product Horizon as 19.4.2005, in other words allowing any required production to be raised by SNP.
If you are not getting the required results through the Heursitics (I assume you mean the SNP Heuristics ??) then check the Transportation Lanes, Quota Arrangements and SNP PPM's are correct.