Question:
Hi all!
I have this unusual scenario:
I have one device and I want to bill the consumption to 2 diffrent business parteners with 2 diffrent rates. The consumption for each business partenet is calculated as a procentage from the all consumption of the device.
I tried this and it works:
one device installed tehnical in one installation
2 premises + 2 billing related installation of the device
2 BP + 2 CA + 2 Utility Contracts.
This scenario works if each business partener is billed with a rate from the same billing class.
But I want to bill the device with rates from diffrent billing classes.
Anyone managed to configure this scenario?
Answer:
Hi,
It should not be a problem to bill the two installations with different billing classes (I have done so). The only restriction is to use the same weighting procedure on the register operands since the consumption should be weighted in the same way (very strange situation especially since you take a percentage).
Best regards,
Henrik
Answer:
I forgot to mention that I'm in division 02 - gas which needs a GAS Procedure at register level.
This gas procedure is dependent on billing class.
So when I install the device in the first installation I choose gas procedure for the billling class of the installation. Then when I install the device in the second installtion the gas procedure for the first installtion is overwrited with second gas procedure, because there's only one record in table EADZ.
Thanks,
Daniel